The Frees System consists of the following steps:
Step 1 - Problem Analysis
Phase I - D&E
On-site project survey Initial job scope estimate and budget. The designated representative will prepare the Survey, In addition to preparing the System Survey for the customer, the representative would provide the customer with a general cost estimate of the System. This gives the customer an opportunity to determine the budget parameters before the customer incurs any expense.
Step 2 - Proposed Solution
Phase I - D&E
Engineered solution to the systems required single-line scope drawings to identify the proposed solution written proposal for installation, including cost estimation. The sales process gets the commitment of the customer to purchase the engineered solution, The price of the preliminary Design and Engineering depends upon the size and complexity of the project and typically runs from $3,500.00 to $10,000.00.
Step 3 - Project Execution
Phase II - Project
Upon the acceptance of the proposal by the customer, Frees, will then be responsible for completing the installation phase, either by performing the installation, or finding and supervising a local contractor for the installation. The System is fabricated, equipment ordered, and installation scheduled. The System is installed.
Step 4 - Systems Commissioning
Phase II - Project
The System is started up and balanced. The System is placed in permanent operation. Upon the completion of the installation, Frees would conduct the final phase, which is the actual start-up of the System and is included in the product price to customer.